Hydrogen Fichtner Hydrogen
X

Nothing without your approval

The release of cookies enables you to have an optimized experience of our website by processing personal data. Of course, data sovereignty remains in your hand and can be revoked informally at any time.

DEEN
Pre-feasibility study for a green methanol plant in Rivera Pre-feasibility study for a green methanol plant in Rivera

Pre-feasibility study for a green methanol plant in Rivera

Cofusa entrusted Fichtner with performing a pre-feasibility study on a green methanol production plant in Rivera, Uruguay. The electrolyzer and the methanol production plant shall be located next to an existing 12 MWe biomass power plant which serves as a source of CO2 and shall be integrated into the existing infrastructure. As the client had already been in contact with some potential off-takers for the green methanol, the objective of this study was to provide an indication of the technical and economic feasibility of the project and to provide market-related information required by the client to establish a business plan for the green methanol plant.

Our Services

  • Technical evaluation of the green hydrogen production, the methanol synthesis, the related carbon capture and the transportation of methanol
  • Economic evaluation​
  • Concept development of the plant​

Technical Data

  • Power-to-Methanol
  • hydrogen infrastructure

Client

URUFOR-COFUSA Montevideo, Uruguay