Hydrogen Fichtner Hydrogen
X

Nothing without your approval

The release of cookies enables you to have an optimized experience of our website by processing personal data. Of course, data sovereignty remains in your hand and can be revoked informally at any time.

DEEN
Construction of new upper stage testbed P5.2 for the Ariane 6 rocket Construction of new upper stage testbed P5.2 for the Ariane 6 rocket

Construction of new upper stage testbed P5.2 for the Ariane 6 rocket

At DLR's Lampoldshausen site, fuelling and firing tests are to be conducted with the Ariane 6's future upper stage. For this purpose, the new P5.2 testbed was constructed. The installation consists of supply systems for cryogenic media (hydrogen and oxygen) plus gas systems. The testbed is to be tied into the existing infrastructure. Fichtner supervised this project over its entire lifecycle, including lot-by-lot procurement of the testbed and supply systems, through to the project execution and construction site supervision.

Our Services

  • Feasibility study and design of testbed concept​
  • Safety analysis ​
  • Support during detail engineering​
  • Project control​
  • Procurement planning​
  • Supervision of technical execution ​
  • Interface management and expediting​
  • Construction site management​

Technical Data

  • > 20 supervised individual trades

Client

German Aerospace Center (DLR), Germany